Plastic Leak Alarm System ...for World Class Manufacturers

Home   |   FAQs   |   Installation   |   News  |   Espanol     |    Italiano    |     Nederland / Belgie    |    Francais / Belgique

 

 

 

 

        Installation...

         uPower Supply Requirement: 12-24 volts DC, 50mA max    v Air Supply Requirement: 4-7 kg/cm2 (60-140psi) <0.2 litre/min (<0.01CFM)

Download LA500 and LM2050 Technical Documentation (from May 2007) in English 

     LA500 Two Character LED Display        LM2050 Full Text Display       Old Technical Documents                    

     (up to April 2007)

  • LA500 Installation Guide LAPG  

  • LA500 Programming Guide LAPGM

 
  • LM2050 Installation Guide LMPG  

  • LM2050 Programming Guide LMPGM

  LM2050 User Manual (01/99 to 04/07)

Note: Installation guide pages are laid out to allow you to fold them into booklet format 4

        For further information e-mail info@airtect.com

 

General Installation Arrangement (for detailed drawings click here: LM2050   LA500)


 
 

"don't leave a mould without it"

Head Office: Airtect Limited, 52 Vernon Avenue, Clontarf, Dublin 3, Ireland  Tel: +353 87 299 6101  Email: info@airtect.com

GB:   Unit 14 Rutherford Way, Drayton Fields, Daventry, NN11 8XW    Tel : +44 (0) 8454 70070, www.mouldshop.com